PROJECT · FORT MYERS · IN PROGRESS

A Whole-Home Remodel in Fort Myers

Kitchen, two bathrooms, flooring, and paint, all moving on one schedule in a Heritage Palms home in Fort Myers. These are real progress photos from June 2026: white shaker cabinetry going in, large-format marble-look porcelain slabs on the shower walls, and the client’s furniture wrapped and protected even though the home sat vacant during construction. This is what the middle of a well-run remodel actually looks like.

Master bathroom during remodel with marble look slab shower walls and white vanity cabinets being installed ◇ Progress photo · June 2026

Project Facts

LOCATION
Heritage Palms, Fort Myers, FL
SCOPE
Kitchen · primary and guest baths · laundry · flooring · interior paint
PRIMARY BATH
Redesigned shower, double vanity, new framing, plumbing, lighting, and tile in a light palette
PROPERTY
Vacant during construction; belongings protected throughout
STATUS
In progress · photos June 2026

Kitchen, Bath, and Laundry: One Coordinated Schedule

Running several rooms at once is where a remodel is won or lost. In the same weeks these photos were taken, the kitchen cabinet runs were set and leveled, the master bath was getting its porcelain slab walls, and the laundry room was stripped and prepped. One team sequencing every trade helps coordinate the tile setter, the cabinet crew, and the plumber.

White shaker kitchen cabinets installed during a Fort Myers whole home remodel by Alliance Construction
Kitchen: white shaker uppers and bases set, counters templated next
Walk in shower with large format marble look porcelain slab walls and valve rough in during a Fort Myers bathroom remodel
Master shower: large-format marble-look porcelain slabs, bench, and hex mosaic floor
Kitchen cabinet runs installed around a window during a Fort Myers remodel, counters pending
Window wall: runs aligned and scribed before counter template
Furniture wrapped in protective plastic sheeting inside an occupied Fort Myers home during remodeling
Furniture, electronics, and floors wrapped before dusty phases begin

Protected Like Someone Lives There

This home sat vacant during construction, and the protection you see went up anyway: furniture sheeted and taped, electronics covered, floors papered, and every area outside the renovation sealed off. That is our standard whether anyone is home or not, and the project ends with a full post-construction cleaning so the home comes back ready to enjoy.

It started the way our projects usually do: Paulo and Mury walked the property with the client, confirmed the selections room by room, and set the plan, with the primary bath as the heart of it, redesigned around a new shower, a double vanity, and tile in a light, elegant palette carried through the rest of the home.

The Laundry Room, One Month Apart

The same room, photographed in June and again in July. Stripped to patched drywall first, then base cabinets set and the tile wall up, with plumbing roughed in behind it. This is the rhythm of a coordinated remodel: each room moves through demo, rough-in, and finish on its own schedule while the whole project stays on one timeline.

Laundry room stripped to patched drywall during demolition in June
June: demo complete, plumbing stub-outs taped
White laundry base cabinets installed with tile wall up one month later
July: base cabinets set, counters templated next
Laundry room tile wall and cabinet corner with plumbing rough in during remodel
July: tile wall up, rough-in behind the cabinet run