Additions We Build
Home Addition FAQs
Do I need a permit for a home addition in Fort Myers?
Yes, always. Any addition of conditioned square footage requires a Lee County building permit, engineered plans, and inspections. We handle all of it as part of the project.
Do I need to hire an architect separately?
Usually not. We coordinate the design drawings and structural engineering within the project, and we’ll tell you up front if your specific addition needs more.
How long does an addition take?
It depends on scope. Design and permitting typically run several weeks before construction starts, and the build itself varies with size and complexity. The estimate we hand you includes a schedule expectation for your project.
Will the addition match my existing house?
That’s the goal, and it’s mostly decided in design: matching roof pitch, stucco texture, window styles, and floor heights. It’s the difference between an addition and something that looks bolted on.
Can you convert my lanai into a real room?
Yes: lanai conversions are permitted structural work involving the wall, glazing, and HVAC changes. If you want to keep it as outdoor space instead, our outdoor living team handles that side.
Is an addition cheaper than moving?
It depends on scope, but an addition avoids realtor fees, moving costs, and losing a low mortgage rate. We’ll put a defined scope and number on the table so you can make that comparison honestly.

